Area Transit High Speed Network

Current Lines

H1 Line

Overview

The H1 serves 4 stations between Scarborough and Redwood, with transfers available to the H4, T1, T6, T8, U2, and U4 lines.

Stations

Camden Crossover (U1, U4)

Flower Fields (U1, T6)

North Forest (U1)

Forest Bay (U1, U3, T3, H4)

Savanna Hill (U1, T2)

Blue Mountain (U1)

Rolling Stock

The U1 originally used 2 carriages of A1A stock. It was upgraded to use 4 carriages of B1 stock sometime after the U4 opened, which neccessitated the extension of the Forest Bay and Savanna Hill platforms.

Speed

The U1 primarily uses 120 speed track.

U2 Line

Overview

The U2 serves 5 stations between Linkurk and Scarborough, with transfers available to the H1, H4, T1, and U4 lines. It was constructed after H-4 construction was complete, though only to Ingram; the extension to Scarborough was built along with the H1 in December 2025.

Stations

Scarborough Fair Boulevard (H1, U2)

Ingram Central (U2)

Willesden Hill (U2)

Calumet City (H1, U2, U4)

Freedom Terminal (H1, H4, T1, U2)

Rolling Stock

The U2, from opening, has always used 3 carriages of A2 stock, and is the only line to currently use A2 stock.

Speed

The U2 primarily uses 120 speed track.

U4 Line

Overview

The U4 serves 4 stations between Calumet City and Camden, with transfers available to the H1, T8, U1, and U2 lines. It was the most recently constructed metro line in the city, and has never been extended.

Stations

Calumet City (H1, U2, U4)

Kemo Town (U4)

Oakton (T8)

Camden Crossover (U1, U4)

Rolling Stock

The U4 has always used 4 carriages of B1 stock, and was the first line to do so.

Speed

The U4 primarily uses 100 speed track.

Former Lines

U3 Line

Overview

The U3, originally known as Line A, was uniquely not constructed by qrid but rather by CharWorld. It served 3 stations between Black Forest and Port Sammy, and had transfers available to the H4, T2, T3, T7, and H4 lines. The line was decommissioned when the T6 was extended to Port Sammy, though the U3 platform at Black Forest was abandoned.

Stations

Black Forest (T6)

Forest Bay (U1, U3, T3, H4)

Port Sammy (T2, T6, T7)

Rolling Stock

The U3 originally used 2 carriages of A1B stock, but was switched to A1A stock soon after.

Speed

The U3 had the fastest track on any Metro line, with 160 speed track. When the U3 was replaced by the T6, this track was swapped to 100 speed.

Future Lines

U5 Line

Overview

The U5 is a proposed line that would run between the Redwood Transportation Center and Savanna Hill. It would use a new kind of rolling stock, which would be named F1 stock.

Back to Index

2026 JRSC